-
Anafis'
port Construction - Under construction
-
Thiras' Port Construction - Under construction
-
Sami's
piscatorial refuge (Kefalonia isle), year
of completion: 2004-2005.
-
Floating
buoy system laying in Fira anchorage (Santorini isle): Laying of two floating buoys for cruiser mooring of a
total diameter of 5m each in Fira bay. The technical study
and construction constitute an international patent. Total
casting depth of the system's anchors is 300m. Year of
completion: 2001.
-
Xirokampos
(Leros isle) piscatorial refuge: Construction
of a piscatorial haven (external protection works and
internal seawall) in Leros Island. Foundations were made
in a 18.000m length distance with gravel piles situated
in a 1,80m depth. Year of completion: 2001.
-
Phoenix' refuge for piscatorial and leisure vessels
(Syros isle), 2001.
-
St
Andrea's deck and passenger's building construction
(Astypalea isle), 2001.
-
Manganite's piscatorial refuge (Ikaria isle),
2000.
-
Wharf construction for F/B mooring in Thirassia anchorage,
(Santorini Isle), 2000.
-
Milos' island main port, 2000.
-
Reconstruction of Mount Athos' port, 2000.
-
Naxos'
leisure vessel refuge, 1999.
-
Hermoupolis'
piscatorial refuge (Syros isle), 1999.
-
Construction of docking and harbour installations
for Aegean Perlites SA (Yiali isle), 1996.
-
Loutra refuge for piscatorial and leisure vessels
(Kythnos isle), 1992.
-
Livadi refuge for piscatorial and leisure vessels
(Serifos isle), 1992.
-
Pier construction in the south part of the port of
Syros isle: Creation of breakwater in the south part
of Syros port and its extremities. The construction has
an 8,00m depth load and total groundwork length 200m.
The extremities' foundations were created in 30m seabeds.
Year of completion: 1986.
-
Floating buoy system laying in Fira anchorage
(Santorini isle), 1986.
-
Construction of Anafi isle windward jetty, 1986.
-
Port
project in Stylida (Agro invest installations): Seawall of 16,50m depth load and total groundwork length
220m. Construction of terrestrial areas, which sum up
a total area of 25.000 m². Year of completion: 1981.
-
Commercial
harbor Kanavi (Milos island): Wharf construction
of 12,00m depth load and total groundwork length 150m.
Construction of terrestrial areas, which sum up a total
area of 5.000 m². Year of completion: 1985.
-
Construction of new mooring position in Syros' port
passenger section Seawall of total groundwork length
600m (1st, 2nd and 3rd phase), 1978-1982.
-
Phoenix' Nautical Base (Syros isle), 1980.
-
Parikia refuge for piscatorial and leisure vessels
(Paros isle), 1980.
-
Astypalea port construction, Seawall of 150m
total length, 1980.
-
Quay construction of Tinos' isle external port:
Quay construction of 8,00m depth load, 50m width and 80m
length in the external port of Tinos island. Year of completion:
1977.
-
Serifos harbour works, Seawall of 130m total
length, 1970.